A run requires a valid selection.
The run parameters are
Not all combinations of run parameters are supported. If the model has a network:
The Capacity Frequency and Duration takes account of the unplanned downtime only; ignoring any capacity profiles and planned downtime. These results make no distinction between producers and consumers. From the unit perspective, the Capacity Frequency and Duration results are based on the items' listed unplanned events and provide lifetime MTTF and breakdown MTTR estimates. ARTIS cannot check the quality of the event data, hence it is assumed that these checks have already been completed.
Whenever using Monte Carlo simulations, the user must ensure that the number of samples is sufficient for all results to be free of random noise, that is usually with 3 significant digits.